Modelling of pollutant removal rates in constructed wetlands under varying hydraulic loading rates

dc.contributor.authorUdukumburage, RS
dc.contributor.authorAriyasena, MADN
dc.contributor.authorRupasinghe, GGMBMB
dc.contributor.authorKarunarathne, S
dc.contributor.editorHemalal, PVA
dc.date.accessioned2022-07-06T04:46:34Z
dc.date.available2022-07-06T04:46:34Z
dc.date.issued2013-06
dc.description.abstractA subsurface horizontal flow constructed wetland located at University of Moratuwa was observed from January 2012 to November 2012 in order to derive empirical equations for the treatment efficiencies of BOD, COD, Nitrate-N, Nitrite-N and Total Phosphorous with varying hydraulic loading rates. Source of polluted water was the grey water effluent from the Staff canteen which is located near the constructed wetland. BOD, COD, Nitrate-N, Nitrite-N and Total Phosphorous, turbidity and conductivity were taken to ascertain the water quality. Overall treatment efficiency of the wetland cell is above 75% for all parameters. Regression technique was used to derive the empirical equations. IBM SPSS statistics -20 software was used in analysing the experimental data. The derived equations exhibit a high level of accuracy since predicted data and actual data shared a strong correlation of 79.1% for COD, 93.2% for BOD, 85.1% for Nitrate-N, 84.1% for Nitrite-N and measurements 86.2% for Total Phosphorous. Constructed wetlands in tropic environments capable of using these equations with relevant adjustments to the original.en_US
dc.identifier.citationUdukumburage, R.S., Ariyasena, M.A.D.N., Rupasinghe, G.G.M.B.M.B., & Karunarathne, S. (2013). Modelling of pollutant removal rates in constructed wetlands under varying hydraulic loading rates. In P.V.A. Hemalal (Ed.), Proceedings of the 7th National Conference on Earth Resources Management (pp. 63-67). Department of Earth Resources Engineering, University of Moratuwa.en_US
dc.identifier.conference7th National Conference on Earth Resources Managementen_US
dc.identifier.departmentDepartment of Earth Resources Engineeringen_US
dc.identifier.emailShiromi27@yahoo.co.uken_US
dc.identifier.facultyEngineeringen_US
dc.identifier.pgnospp. 63-67en_US
dc.identifier.placeKatubeddaen_US
dc.identifier.proceedingProceedings of the 7th National Conference on Earth Resources Managementen_US
dc.identifier.urihttp://dl.lib.uom.lk/handle/123/18424
dc.language.isoenen_US
dc.publisherDepartment of Earth Resources Engineeringen_US
dc.subjectBODen_US
dc.subjectCODen_US
dc.subjectNitrate-Nen_US
dc.subjectNitrite-Nen_US
dc.subjectTotal phosphateen_US
dc.titleModelling of pollutant removal rates in constructed wetlands under varying hydraulic loading ratesen_US
dc.typeConference-Full-texten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Modelling of Pollutant Removal Rates in Constructed.pdf
Size:
832.17 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections