A study of delays in procurement of engineered equipment for engineering, procurement and construction (EPC) projects in India: a mixed method research approach

dc.contributor.authorSandilya, SK
dc.contributor.authorVarghese, K
dc.contributor.editorSandanayake, YG
dc.contributor.editorFernando, GI
dc.contributor.editorRamachandra, T
dc.date.accessioned2022-03-11T09:55:11Z
dc.date.available2022-03-11T09:55:11Z
dc.date.issued2016-07
dc.description.abstractThe supply chain of the EPC industry operates predominantly in an engineered to order manner. Most of the equipment procured are specially made for the project as per the technical specifications laid in the contract. Due to this the lead time of these equipment are generally higher than products that are ‘out of the shelf’. Any delay in procurement of these equipment can have a cascading effect on the overall construction schedule. There is limited literature available on the procurement in the EPC industry. This paper thus presents a comprehensive review of the existing systems and practices for procurement of engineered equipment in EPC projects in India. The practices are analysed separating them into two segments, i.e. pre-order and post order procurement cycles. An exploratory sequential mixed method of research has been adopted for the purpose by taking inputs from Subject Matter Experts from different industries in the EPC sector. These inputs were in the form of semi structured interviews, which were analysed using the qualitative data analysis package NVIVO 10. A triangulation methodology has been attempted to validate the qualitative data collected. Finally a framework for improving the most significant of the delays in these projects has been presented.en_US
dc.description.sponsorshipInternational Council for Research and Innovation in Building and Construction (CIB)en_US
dc.identifier.citationSandilya, S.K., & Varghese, K. (2016). A study of delays in procurement of engineered equipment for engineering, procurement and construction (EPC) projects in India: a mixed method research approach. In Y.G. Sandanayake, G.I. Karunasena & T. Ramachandra (Eds.), Greening environment, eco-innovations & entrepreneurship (pp. 34-43). Ceylon Institute of Builders. https://ciobwcs.com/downloads/WCS2016-Proceedings.pdfen_US
dc.identifier.conference5th World Construction Symposium 2016en_US
dc.identifier.departmentDepartment of Building Economicsen_US
dc.identifier.emailsrikarkalidoss@gmail.comen_US
dc.identifier.facultyArchitectureen_US
dc.identifier.pgnospp. 34-43en_US
dc.identifier.placeColomboen_US
dc.identifier.proceedingGreening environment, eco-innovations & entrepreneurshipen_US
dc.identifier.urihttp://dl.lib.uom.lk/handle/123/17292
dc.identifier.year2016en_US
dc.language.isoenen_US
dc.publisherCeylon Institute of Buildersen_US
dc.relation.urihttps://ciobwcs.com/downloads/WCS2016-Proceedings.pdfen_US
dc.subjectProcurementen_US
dc.subjectEPCen_US
dc.subjectEngineered equipmenten_US
dc.subjectMixed methoden_US
dc.subjectDelaysen_US
dc.titleA study of delays in procurement of engineered equipment for engineering, procurement and construction (EPC) projects in India: a mixed method research approachen_US
dc.typeConference-Full-texten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
A STUDY OF DELAYS IN PROCUREMENT OF ENGINEERED.pdf
Size:
331.28 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections