Parameter estimation of pollutant removal for subsurface horizontal flow constructed wetlands treating greywater

dc.contributor.authorWijesiri, MKBS
dc.contributor.authorJayasooriya, VM
dc.contributor.authorKarunarathne, S
dc.contributor.editorRatnayake, NP
dc.contributor.editorAbeysinghe, AMKB
dc.date.accessioned2022-07-02T07:41:06Z
dc.date.available2022-07-02T07:41:06Z
dc.date.issued2011-11
dc.description.abstractTreatment efficiencies of pilot scale constructed wetland treating greywater from a staff canteen of the University of Moratuwa was studied to estimate the temperature dependent reaction rate constants of specific pollutant removal mechanisms. The treatment cell, constructed below the ground level is four meter (4.0 m) long 1.8 m wide (at the top level). The cell is divided longitudinally at the centre while vertical baffles are provided at approximately 590 mm intervals, running through the entire vertical depth (0.75 m) of the wetland cell with an opening of 270 - 380 mm. Considering the middle separation, the effective average width and the length of the treatment cell is 0.75 m and 8.0 m, respectively. The bed is vegetated with cat tail (Typha Latifolia) planted at approximately 0.75 m intervals. The study estimates the design parameters pertaining to local conditions to optimize the design considerations and sizing requirements using both first order and Monod type models. The estimated parameters can effectively be applied in sizing constructed wetlands in tropical climatic conditions. The results show that the surface area of SHF CWs can be reduced by 26% by utilizing the newly estimated parameters from the current study.en_US
dc.identifier.citationWijesiri, M.K.B.S., Jayasooriya, V.M., & Karunarathne, S. (2011). Parameter estimation of pollutant removal for subsurface horizontal flow constructed wetlands treating greywater. In N. P. Ratnayake & A.M.K.B. Abeysinghe (Eds.), Proceedings of the 6th National Conference on Minerals and Innovative Thinking (pp. 29-32). Department of Earth Resources Engineering, University of Moratuwaen_US
dc.identifier.conference6th National Conference on Minerals and Innovative Thinkingen_US
dc.identifier.departmentDepartment of Earth Resources Engineeringen_US
dc.identifier.emailshiromi27@yahoo.co.uken_US
dc.identifier.facultyEngineeringen_US
dc.identifier.pgnospp. 29-32en_US
dc.identifier.placeKatubeddaen_US
dc.identifier.proceedingProceedings of 6th National Conference on Minerals and Innovative Thinkingen_US
dc.identifier.urihttp://dl.lib.uom.lk/handle/123/18413
dc.identifier.year2011en_US
dc.language.isoenen_US
dc.publisherDepartment of Earth Resources Engineeringen_US
dc.subjectBOD5en_US
dc.subjectCODen_US
dc.subjectFirst order kineticsen_US
dc.subjectNutrientsen_US
dc.titleParameter estimation of pollutant removal for subsurface horizontal flow constructed wetlands treating greywateren_US
dc.typeConference-Full-texten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Parameter Estimation of Pollutant Removal for Subsurface.pdf
Size:
708.91 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections