Suitability of delay analysis techniques : consideration of resources and legal background
dc.contributor.advisor | Perera, BAKS | |
dc.contributor.author | Fernando, PDK | |
dc.date.accept | 2023 | |
dc.date.accessioned | 2025-06-03T04:38:48Z | |
dc.date.issued | 2023 | |
dc.description.abstract | The study focuses on using critical path methods in legitimate delay analysis in the construction industry to address delay claims fairly and accurately. The research problem centres on the accountability of delay analysis techniques, the SCL protocol, and the legal framework that governs them to ensure unbiased and accountable outcomes. The literature review covers claims, delays, and delay analysis methods in the construction industry, the legal context for claims, and the importance of project scheduling, offering resources for selecting the best approach and emphasising the significance of these methods in claims management. The methodology employed a systematic and scientific approach, using qualitative research methods and semi-structured interviews to collect data, with subsequent chapters analysing the findings obtained through manual content analysis. The research findings stressed the importance of selecting appropriate delay analysis methods in construction projects, considering factors such as data availability, contractual obligations, and project complexity. Legal considerations, the analyst’s skills and judgment, and the attitudes of the opposing party also play a crucial role in the accuracy and reliability of delay analysis. These findings offer valuable insights for practitioners and create opportunities for further research in this field. In conclusion, reliable and proper delay analysis is critical for successful construction project outcomes, and selecting the appropriate delay analysis method should be based on project-specific factors and data accessibility. Adherence to the SCL protocol, accurate record-keeping, and consultation with experienced delay analysts are crucial for effective dispute resolution and timely project completion. It is recommended to follow a step-by-step approach for selecting a delay analysis method based on contract requirements, availability of a logic-linked baseline programme, and discussions with engineers, considering the availability of time, resources, and data on delay events and the as-built programme. Careful evaluation of all project factors and requirements is essential before selecting the appropriate delay analysis method. Consulting with experienced professionals is also recommended. | |
dc.identifier.accno | TH5192 | |
dc.identifier.citation | Fernando, P.D.K. (2023). Suitability of delay analysis techniques : consideration of resources and legal background [Master's theses, University of Moratuwa]. Institutional Repository University of Moratuwa. https://dl.lib.uom.lk/handle/123/23592 | |
dc.identifier.degree | Master of Science in Construction Law and Dispute Resolution | |
dc.identifier.department | Department of Building Economics | |
dc.identifier.faculty | Architecture | |
dc.identifier.uri | https://dl.lib.uom.lk/handle/123/23592 | |
dc.language.iso | en | |
dc.subject | DELAY ANALYSIS | |
dc.subject | SCL PROTOCOL | |
dc.subject | CLAIM | CRITICAL PATH METHOD | |
dc.subject | CONSTRUCTION LAW AND DISPUTE RESOLUTION- Dissertation | |
dc.subject | BUILDING ECONOMICS- Dissertation | |
dc.subject | MSc in Construction Law and Dispute Resolution | |
dc.title | Suitability of delay analysis techniques : consideration of resources and legal background | |
dc.type | Thesis-Abstract |
Files
Original bundle
1 - 3 of 3
Loading...
- Name:
- TH5192-1.pdf
- Size:
- 575.16 KB
- Format:
- Adobe Portable Document Format
- Description:
- Pre-text
Loading...
- Name:
- TH5192-2.pdf
- Size:
- 243.89 KB
- Format:
- Adobe Portable Document Format
- Description:
- Post-text
Loading...
- Name:
- TH5192.pdf
- Size:
- 1.3 MB
- Format:
- Adobe Portable Document Format
- Description:
- Full-thesis
License bundle
1 - 1 of 1
Loading...
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed upon to submission
- Description: