dc.description.abstractIn developing countries, public construction procurement represents a substantial proportion of construction procurement. However, it encounters problems that hinder the economic growth of the country. Problems such as poor quality performance, time overruns, cost overruns, risk overruns, fraud and corruption, tender recalls and shortage of qualified and motivated professionals are prevalent in the public procurement process. Root causes of these problems such as inadequate documentation, poor communication among team members, inadequate procurement knowledge and skills of the procurement team members, inadequate knowledge of the procurement regulations, and inadequate planning often originate in the pre-contract phase, leading to problems in the public procurement process, ultimately effect with conflicts and disputes in public construction projects. Therefore, these root causes should be effectively addressed in the pre-contract stage to minimise disputes in the post contract stage, by having a procurement team with the required competencies in the pre-contract phase. Thus, this research focused on investigating the competencies of the procurement team in the pre-contract stage to minimise disputes in public construction projects in Sri Lanka, as well as investigating the professionals who should possess the identified competencies. This study followed a mixed method approach, starting with a comprehensive literature review, followed by a questionnaire survey and a semi-structured interview with experts. Accordingly, Architects, Engineers and Quantity Surveyors participated in the questionnaire survey, while fifteen industry experts including Architects, Quantity Surveyors and Engineers possessing experience in public procurement were selected through purposive sampling for the semi-structured interviews. The sample was validated through ‘saturation’ to ensure reliability. Data analysis was conducted using Relative Importance Index (RII) for the questionnaire survey, and code based content analysis for the semi-structured interviews. The research findings offered thirty-six (36) root causes of the problems in the pre-contract stage, while forty-three (43) competencies for the pre-contract stage, and the relevant professionals for each competency. Finally, a competency requirement framework was developed, integrating pre-contract sub-stages, root causes, necessary competencies, and relevant professionals. The framework provides valuable insights aiming to optimise the public procurement process and to minimise disputes in public construction projects in Sri Lanka.
dc.identifier.accnoTH5571
dc.identifier.citationWeerathunge, S.S. (2024). Competency requirements of procurement team in pre-contract stage to minimise disputes of public construction projects in Sri Lanka [Master’s theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.uom.lk/handle/123/20862
dc.identifier.degreeMaster of Science in Construction Law and Dispute Resolution
dc.identifier.departmentDepartment of Building Economics
dc.identifier.facultyArchitecture
dc.identifier.urihttps://dl.lib.uom.lk/handle/123/23781
dc.language.isoen
dc.subjectCONSTRUCTION INDUSTRY-Pre-Contracts
dc.subjectRIBA PLAN OF WORK 2020
dc.subjectCONSTRUCTION INDUSTRY-Procurement
dc.subjectCONSTRUCTION INDUSTRY-Disputes
dc.subjectGOVERNMENT PURCHASING
dc.subjectCONSTRUCTION PROJECT MANAGEMENT
dc.subjectCONSTRUCTION INDUSTRY-Sri Lanka
dc.subjectBUILDING ECONOMICS-Dissertation
dc.subjectMSc in Construction Law and Dispute Resolution
dc.titleCompetency requirements of procurement team in pre-contract stage to minimise disputes of public construction projects in Sri Lanka
dc.typeThesis-Abstract

Files

Original bundle

Now showing 1 - 3 of 3
Loading...
Thumbnail Image
Name:
TH5571-1.pdf
Size:
812.4 KB
Format:
Adobe Portable Document Format
Description:
Pre-text
Loading...
Thumbnail Image
Name:
TH5571-2.pdf
Size:
324.96 KB
Format:
Adobe Portable Document Format
Description:
Post-text
Loading...
Thumbnail Image
Name:
TH5571.pdf
Size:
4.97 MB
Format:
Adobe Portable Document Format
Description:
Full-thesis

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: