dc.description.abstract | There are only three combined cycle power plants in Sri Lanka. Ceylon Electricity Board owns one power plant, and private companies own the other two. Combined cycle power plants start-ups can be divided into three categories such as hot, warm and cold. Most of the start-ups are hot start-ups due to varying demand in the Sri Lankan’s grid system. During start-up, power plant run at part load, which is inefficient. Because a portion of the steam generated is directed to the atmosphere during boiler warming up, it is essential to reduce the combined cycle power plants' start-up time. This thesis focuses on optimising hot start-up time without compromising equipment reliability. The thesis is carried out on a combined cycle power plant in Sri Lanka. Parameters during hot start-ups between 2019 and 2021 were collected in a minute interval. After analysing the start-ups in 2019 and 2020, several experiments were carried out during 2020 and 2021 hot start-ups. For this purpose, the start-up operation was divided into sub-operations, and four critical operations which have a significant impact on start-up time were identified. Operations such as G.T. Loading, High Pressure (H.P.) start-up vent operation, High Pressure (H.P.) steam bypass valve operation and new vent system operation were analysed, and the best optimum operation pattern was identified. | en_US |
dc.identifier.accno | TH4583 | en_US |
dc.identifier.citation | Manickasivam, P, (2021). Minimization of start-up time of sojitz kelanitissa combined cycle power plant [Master's theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.uom.lk/handle/123/21197 | |
dc.identifier.degree | MSc In Energy Technology | en_US |
dc.identifier.department | Department of Mechanical Engineering | en_US |
dc.identifier.faculty | Engineering | en_US |
dc.identifier.uri | http://dl.lib.uom.lk/handle/123/21197 | |
dc.language.iso | en | en_US |
dc.subject | GAS TURBINE | en_US |
dc.subject | HEAT RECOVERY STEAM GENERATOR (HRSG) | en_US |
dc.subject | STEAM TURBINE | en_US |
dc.subject | CYCLE POWER PLANT- Sri Lanka | en_US |
dc.subject | MECHANICAL ENGINEERING - Dissertation | en_US |
dc.subject | ENERGY TECHNOLOGY - Dissertation | en_US |
dc.title | Minimization of start-up time of sojitz kelanitissa combined cycle power plant | en_US |
dc.type | Thesis-Abstract | en_US |