Project management strategies for overcoming operational barriers in bored piling projects in Sri Lanka
Loading...
Date
2026
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
This study develops a project management framework to mitigate operational barriers in Sri Lanka's bored piling industry. Employing a mixed-method approach, literature review, questionnaire survey of 45 practitioners, and four expert interviews; the research identified twenty-four operational barriers. Relative Importance Index analysis revealed three most critical: time restrictions due to residential proximity (RII=0.82), suboptimal drilling techniques (RII=0.78), and logistical challenges with oversized equipment (RII=0.76). Expert interviews contextualised these findings within Sri Lanka's volatile fuel prices, protracted governmental approvals, and problematic clay-based soils.
A four-stage framework integrating Lean Management, Six Sigma, Critical Path Method, and Kaizen was developed, encompassing: (1) root-cause diagnosis using Fishbone diagrams; (2) strategic alignment of PM methodologies to specific barriers; (3) implementation through stakeholder collaboration and real-time monitoring; and (4) evaluation via Pareto analysis. Case study application demonstrated significant improvements: Lean reduced material waste by 22 percent; Six Sigma decreased design flaws by 25 percent; and CPM increased on-time project completion by 35 percent. This research offers a scalable model for enhancing efficiency, reducing costs, and promoting sustainability in bored piling operations within Sri Lanka and comparable developing economies.
Description
Citation
Gomes, D.G.N.M. (2026). Project management strategies for overcoming operational barriers in bored piling projects in Sri Lanka [Master's theses, University of Moratuwa]. Institutional Repository University of Moratuwa. https://dl.lib.uom.lk/handle/123/25823
