Project management challenges in implementing foreign funded water supply projects in Sri Lanka

dc.contributor.advisorSeneviratne, LDIP
dc.contributor.authorWeerarathna, N
dc.date.accept2014
dc.date.accessioned2015-07-09T06:49:09Z
dc.date.available2015-07-09T06:49:09Z
dc.date.issued2015-07-09
dc.description.abstractNational Water Supply & Drainage Board (NWSDB) is the principal authority providing safe drinking water and facilitating the provision of sanitation to the nation. Therefore, it is the responsibility of the NWSDB to ensure that the projects undertaken be completed within the prescribed period of time and budget to the prescribed quality in order to assure quality water and an uninterrupted availability of water supply. Most water supply contracts do not meet set cost or time targets as a result of improper assessment of project management challenges in construction. The majority of time and cost overruns are attributable to either unforeseen or foreseen project management challenges for when uncertainties were not properly accommodated. The Sri Lankan practice is to complete the projects even with time and cost overruns and keep moving onto the next project without a proper lessons learnt. However, the project management challenges still prevail in the industry as lessons learned as tacit knowledge. Identification of the project management challenges was done through a comprehensive literature review and a questionnaire was developed to assess the frequency of occurrence and the severity of the effect of each challenge. Relative importance of the challenges were identified analysing the collected data. The key project management challenges in implementing foreign funded water supply projects are related to human resources and the issue should be addressed as a developing nation. National policies shall be introduced, modified, altered and diversified towards building skilled human resources, which is the demand of the future world. Additionally, findings will provide an opportunity to both the NWSDB and the contractors to forecast possible critical scenarios and identify common pitfalls so as to eliminate the avoidable and highlight them to the management to avoid recurrences of such phenomena.en_US
dc.identifier.accno107266en_US
dc.identifier.citationWeerarathna, N. (2014). Project management challenges in implementing foreign funded water supply projects in Sri Lanka [Master's theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.mrt.ac.lk/handle/123/11026
dc.identifier.degreeMSc.en_US
dc.identifier.departmentDepartment of Building Economicsen_US
dc.identifier.facultyArchitectureen_US
dc.identifier.urihttp://dl.lib.mrt.ac.lk/handle/123/11026
dc.language.isoenen_US
dc.subjectWateren_US
dc.subjectproject management
dc.subjectproject management challenges
dc.subjectMSc in Project Management
dc.subjectBUILDING ECONOMICS - Thesis
dc.subjectPROJECT MANAGEMENT - Thesis
dc.subjectPROJECT MANAGEMENT
dc.subjectWATER SUPPLY
dc.subjectWATER SUPPLY PROJECTS-SRI LANKA
dc.titleProject management challenges in implementing foreign funded water supply projects in Sri Lankaen_US
dc.typeThesis-Abstracten_US

Files

Original bundle

Now showing 1 - 3 of 3
Loading...
Thumbnail Image
Name:
107266-1.pdf
Size:
2.27 MB
Format:
Adobe Portable Document Format
Description:
Pre Text
Loading...
Thumbnail Image
Name:
107266-2.pdf
Size:
1.21 MB
Format:
Adobe Portable Document Format
Description:
Post-text
Loading...
Thumbnail Image
Name:
107266.pdf
Size:
23.4 MB
Format:
Adobe Portable Document Format
Description:
Full Thesis