The impact of procurement method on construction time waste

dc.contributor.authorHewamulla, K
dc.contributor.authorJayasena, HS
dc.contributor.authorGuruge, K
dc.contributor.editorSandanayake, YG
dc.contributor.editorWaidyasekara, KGAS
dc.contributor.editorGunatilake, S
dc.date.accessioned2022-12-29T04:13:48Z
dc.date.available2022-12-29T04:13:48Z
dc.date.issued2022-06-24
dc.description.abstractSelection of the most appropriate procurement method for a proposed project is challenging because there are many factors to be evaluated in deciding. This study focuses on the impact of procurement method on construction time waste, and it was conducted to find how the time wastage varies according to the selected procurement route. Such knowledge is important in making better decisions when selecting a procurement method. Accordingly, the research aim was set to find the significant differences of time waste between traditional and design and build procurement methods. this research was conducted from a quantitative approach, deductive theory data collected through an online survey, and for data analysis using descriptive statistics. Twenty-two (22) number of time waste factors were identified through literature review. survey respondents weighted the significance of each factor between traditional and design and build procurement methods. Ten (10) factors caused significantly higher time waste in traditional method and none of the factors caused higher time waste in design and build method. Accordingly, the study concludes that time waste in traditional procurement is generally higher in traditional procurement method compared to design and build procurement methoden_US
dc.identifier.conferenceWorld Construction Symposium - 2022en_US
dc.identifier.departmentDepartment of Building Economicsen_US
dc.identifier.doihttps://doi.org/10.31705/WCS.2022.73en_US
dc.identifier.emailkavishka.hewamulla@gmail.comen_US
dc.identifier.emailsuranga@uom.lken_US
dc.identifier.emailkaviniveenadhi1997@gmail.comen_US
dc.identifier.facultyArchitectureen_US
dc.identifier.pgnospp. 909-920en_US
dc.identifier.placeSri Lankaen_US
dc.identifier.proceeding10th World Construction Symposium - 2022en_US
dc.identifier.urihttp://dl.lib.uom.lk/handle/123/19929
dc.identifier.year2022en_US
dc.language.isoenen_US
dc.publisherCeylon Institute of Builders - Sri Lankaen_US
dc.source.urihttps://ciobwcs.com/2022-papers/en_US
dc.subjectDesign and Build Methoden_US
dc.subjectProcurementen_US
dc.subjectTime Wasteen_US
dc.subjectTraditional Methoden_US
dc.titleThe impact of procurement method on construction time wasteen_US
dc.typeConference-Full-texten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
WCS2022_Proceedings_73.pdf
Size:
1.44 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections