In developing countries, public construction procurement represents a substantial proportion of construction procurement. However, it encounters problems that hinder the economic growth of the country. Problems such as poor quality performance, time overruns, cost overruns, risk overruns, fraud and corruption, tender recalls and shortage of qualified and motivated professionals are prevalent in the public procurement process. Root causes of these problems such as inadequate documentation, poor communication among team members, inadequate procurement knowledge and skills of the procurement team members, inadequate knowledge of the procurement regulations, and inadequate planning often originate in the pre-contract phase, leading to problems in the public procurement process, ultimately effect with conflicts and disputes in public construction projects. Therefore, these root causes should be effectively addressed in the pre-contract stage to minimise disputes in the post contract stage, by having a procurement team with the required competencies in the pre-contract phase. Thus, this research focused on investigating the competencies of the procurement team in the pre-contract stage to minimise disputes in public construction projects in Sri Lanka, as well as investigating the professionals who should possess the identified competencies. This study followed a mixed method approach, starting with a comprehensive literature review, followed by a questionnaire survey and a semi-structured interview with experts. Accordingly, Architects, Engineers and Quantity Surveyors participated in the questionnaire survey, while fifteen industry experts including Architects, Quantity Surveyors and Engineers possessing experience in public procurement were selected through purposive sampling for the semi-structured interviews. The sample was validated through ‘saturation’ to ensure reliability. Data analysis was conducted using Relative Importance Index (RII) for the questionnaire survey, and code based content analysis for the semi-structured interviews. The research findings offered thirty-six (36) root causes of the problems in the pre-contract stage, while forty-three (43) competencies for the pre-contract stage, and the relevant professionals for each competency. Finally, a competency requirement framework was developed, integrating pre-contract sub-stages, root causes, necessary competencies, and relevant professionals. The framework provides valuable insights aiming to optimise the public procurement process and to minimise disputes in public construction projects in Sri Lanka.

Description

Citation

Weerathunge, S.S. (2024). Competency requirements of procurement team in pre-contract stage to minimise disputes of public construction projects in Sri Lanka [Master’s theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.uom.lk/handle/123/20862

DOI

Endorsement

Review

Supplemented By

Referenced By